East Africa
Electricity access in five East African countries
Kenya reached 77% electricity access in 2024, followed by Rwanda at 72% in this five-country snapshot. Ethiopia, Uganda and Tanzania were between 52% and 57%.
Sources checked
The 24.6 percentage point gap between Kenya and Tanzania is a comparison for 2024.
Electricity access across the years
Shared scale from zero to 100.00 %. A gap marks a year without an observation.
Ethiopia
20142024
56.60 % · 2024
Kenya
20142024
77.00 % · 2024
Rwanda
20142024
72.00 % · 2024
Tanzania
20142024
52.40 % · 2024
Uganda
20142024
55.30 % · 2024
What the gap measures
The indicator counts the share of people with access to electricity. The chart compares the same calendar year across five countries. The table includes earlier observations for each one. Source 1
How to read change
Rwanda moved from 63.9% in 2023 to 72% in 2024, a rise of 8.1 percentage points. Access rates do not tell us how often service was interrupted or how much it cost. Source 1
What this means for infrastructure
A grid extension, a mini-grid and a stand-alone system can all contribute to access. To assess a particular project, pair the national series with household connections, service reliability and connection charges for the places it reaches. Source 1
Why percentages and counts differ
A country with a lower percentage can have more connected people if it has a larger population. This comparison keeps the denominator consistent within each country so the gaps are easier to read. Source 1